DC Opportunity Diagnostic
Analyzing system…
1
Use Case
2
Input
3
System
4
Impact

Configure Assessment

Select the project context to tailor the diagnostic output for your customer.

Use Case Segment

What type of site or project?

Industrial Manufacturing
CNC, robotics, servo drives, VFD motors, automated production lines
Logistics & EV Depot
Fleet electrification, EV charging depots, warehousing, high-bay storage
Data Centre
Server halls, colocation facilities, edge data centres, UPS-backed infrastructure
Office Buildings
Commercial office complexes, mixed-use buildings, smart building infrastructure

Project Phase

Is this an existing facility or a new build?

New Build / Expansion
Planning or designing a new facility, major extension, or greenfield project. Architecture decisions are still open.
Existing Facility
Retrofitting or upgrading an existing electrical infrastructure. AC architecture is already in place.
Primary Challenge What's the biggest challenge you're facing? — optional

Assess Your Site's Electrical Setup

Upload available data or describe your system briefly. The diagnostic takes about 2 minutes.

What is changing in the next years?

PV installation
Battery storage
Electrification (heat)
Electrification (vehicles)

Site Overview

Optional — improves peak shaving estimate

What is installed on site?

CNC / robotics / servo drives
Conveyors / automated handling
Pumps / compressors (VFDs)
EV chargers / DC loads
LED lighting systems
HVAC / climate control
High-bay warehouse / AS-RS
Welding / induction heating

Import Existing Data (optional)

Improves insight quality — not required.

What It Takes to Electrify Your Fleet

See the battery and PV sizes that work for your routes: in AC and DC.

Live parameters — simulate cases with the customer.
Why is DC more efficient? See the energy flow.

Feasibility is a first-order aggregate: grid capacity plus battery vs. fleet daily energy demand, at the site-profile assumptions shown. Not a substitute for hourly load-flow simulation, and it does not guarantee individual truck schedule compliance. Site profile: Reference Logistics Company (structural composite of a real regional-logistics depot; sensitive parameters withheld).

Indicative system model based on typical equipment behavior. Not a substitute for detailed engineering analysis.

Estimated Impact

High-level assessment based on your site profile. All figures are indicative ranges.

Assessment

What drives savings at your site

Indicative Business Case

Investment & Return Overview

Scaled estimates based on ODCA reference data for a DC backbone deployment. All figures are indicative.


Indicative estimate based on ODCA reference data. Actual figures may vary depending on site specifics.

Engineering Package

Sample output from the Kodnyx design platform. This is an indicative preview — not a final deliverable.